Adora De Goa
Brife Scope
TThe project scope includes the construction of Sewage Treatment Plants (STPs), Underground Sumps (UG Sumps), internal roads, and drainage systems, along with allied infrastructure and beautification works. This encompasses efficient wastewater management, road development, and landscape enhancements to ensure a well-integrated and sustainable environment.
3 STPs: 1,50,00,000 ltr cumulative capacity
2 UG Sumps: 50,00,000 ltr cumulative capacity
Internal Roads: 5,000 mtr
Drains: 10,000 mtr